Stockwell and Cross Pointe Forcemain Relocation

This project included relocating approximately 162 feet of 10" forcemain on Division Street just west of Stockwell.  It also included relocating approximately 51 feet of 12" forcemain on the NW corner of Cross Pointe Boulevard and Lloyd Expressway in preparation for improvements related to the upcoming INDOT Lloyd4U project.​​

​

2022 Annual Lining, Hitch & Peters Road Project

This project included the rehabilitation of over 1,800 feet of sanitary sewer pipe on Hitch & Peters Road between Lynch Road and St. George Road.  Additional work included the rehabilitation of 16 sanitary sewer manholes within the project limits.   â€‹

​

Lloyd SSRMP Manhole Rehabilitation, Phase 1 Project

This project included the rehabilitation of over 230 sanitary sewer manholes within the Lloyd Basin on the east side of Evansville.  The work consisted of manhole frame and cover replacements, precast manhole section replacements, interior flowline modifications and installation of interior linings.  

​

 

Lynch Road Lining

This project included CIPP lining approximately 350 feet of 10" diameter sewer main, 3900 feet of 15" diameter sewer main and reconstruction/lining of manholes along Lynch Road from Hitch and Peters to Debbie Lane.

 

Bee Slough Sewer Rehabilitation Project

This project included CIPP lining approximately 1125 feet of 60" diameter sewer main along Veterans Memorial Parkway near the East Wastewater Treatment Plant, joint grouting, and resetting several frames and covers. 

​

Toyota Trinity Storm Water Park CSS Separation Project

This project included the installation of a new storm water collection system to separate
the storm water from the combined sanitary sewer in downtown Evansville.  This work consisted of the construction of approximately 4,400 linear feet of 12” to 36” storm sewers, 29 new storm sewer manholes and inlets, as well as the installation of a 1 million gallon subsurface detention basin at the site of the former Holy Trinity Catholic Church located at the intersection of NW 3rd Street and Vine Street. 


The project also included the replacement of existing water mains within the storm sewer collection system project area and consisted of the replacement of approximately 4,500 linear feet of 6” to 20” water mains, 60 valves, 9 fire hydrants, 19 water service relocations and restoration. 

​

Walnut Storm Sewer Force Main, Weinbach to Vann 

This project includes the installation of 5,700 feet of 30" C900 PVC force main pipe on Walnut Street from Weinbach Avenue to Vann Avenue in conjunction with road improvements within the corridor.  

​

Burdette Park Lift Station Improvements 

This project includes the modification and rehabilitation of the existing lift station wet well as well as the modernization and upgrade of the existing lift station equipment, electrical and control components, and associated equipment. 

​

Parkside Terrace Lift Station Improvements 

This project includes the modification and rehabilitation of the existing lift station wet well as well as the modernization and upgrade of the existing lift station equipment, electrical and control components, and associated equipment. 

​

2021 Annual Lining - Sweetser Avenue 

This project included the cured in place pipe lining of approximately 3,600 linear feet of 54" sewer main on Sweester Avenue in Evansville.  Work also included manhole rehabilitation throughout the project area.

 

Old State Utility Sewer Rehabilitation, Phase 2

This project includes the lining of approximately 10,000 linear feet of sewer main and the rehabilitation of approximately 43 manholes throughout the former Old State Utility Sewer boundary.  Work also includes any necessary pavement restoration, final grading and seeding of the easement areas.  The project is located in northern Vanderburgh County within and near the Shady Hills and Greenbriar Hills subdivisions.  

​

Daylight South Lift Station Rehabilitation

This project includes the modification and rehabilitation of the existing lift station wet well as well as the modernization and upgrade of the existing lift station equipment, electrical and control components, and associated equipment. The project is located in northern Vanderburgh County on the west side of Highway 57, north of Boonville New Harmony Road and south of Schlensker Ditch.  

​

Carriage House Lift Station Improvements 

This project includes the modification and rehabilitation of the existing duplex lift station wet well as well as the modernization and upgrade of the existing lift station equipment, electrical and control components, and associated equipment. 

 

Bonnieview and Oak Lift Station

 Work related to this project includes the Installation of a new sanitary sewer lift station, combination air valve structures, approximately 160 feet of 6” force main, approximately 2,600 feet  of 8” to 24” sized gravity sanitary sewer pipe with 20 sanitary manhole installations varying from 48” to 96” in diameter.  In addition 28 sanitary sewer lateral and cleanouts are planned to be installed, as well as the demolition of the existing lift station and the retirement of existing sanitary sewer facilities.  Areas of installation include: E. Oak Street from Burkhardt to Bonnieview Drive, Bonnieview Drive from Highcroft Drive to Outer Lincoln Avenue.  Additional improvement areas include the installation of new facilities in easements in two areas.  One area is bound by Burkhardt, Highcroft, Bonnieview and Oak, while the other area is bound by Bonnieview, Oak and Outer Lincoln Avenue. 

​

Browning Road Lift Station Elimination

This project includes the installation of a gravity sanitary sewer system consisting of approximately 2590 linear feet of 8” gravity sanitary sewer and manholes, removal of existing Browning Road Estates Lift Station, and abandonment of 6050 LF of existing 6” force main.  Work is in mostly wooded undeveloped area from just west of Oak Gate Road to just north of Campbell Road in Vanderburgh County, Indiana.

​

Old State Utility Sewer Rehabilitation, Phase 1

This project includes 12 gravity sewer main point repairs, 11 lateral tap repairs and the installation of 4 manholes in various locations throughout the former Old State Utility Sewer boundary.  Work also includes any necessary pavement restoration, final grading and seeding of the easement areas.  The project is located in northern Vanderburgh County within and near the Shady Hills and Greenbriar Hills subdivisions.  

​

​​